Clearfield Water System Improvements

Client: Clearfield Municipal Authority, Clearfield County, PA

Year Completed: 2014

Project Cost: $10,200,000

To address system storage and hydraulic capacity problems, the Clearfield Municipal Authority directed Gwin, Dobson & Foreman to design a functional and cost-effective solution. With a service area population of 13,000 and average daily demand of 1.75 MGD, the system had marginal distribution storage capacity and transmission restrictions. This made it vulnerable to extended service outages such as large main breaks or loss of treatment at its Montgomery or Moose Creek plants.

After an extensive flow and pressure monitoring study, GD&F recommended the installation of three (3) distribution storage tanks, transmission main, pump station replacements and a system-wide water meter replacement program.

Project details included the following:

The project was funded by a $10.3 million low interest loan from PENNVEST.